The following roadworks are likely to cause some delays in the Chiswick area.

A4 Great West Road, Brentford

17 August — 29 September

Delays likely Road closure

Works location: A4

Works description: Carriageway Resurfacing

Responsibility for works: Transport For London

Current status: Advanced planning

B490 Acton Lane, Acton

17 August — 19 August

Delays likely Traffic control (multi-way signals)

Works location: B490

Works description: 27/040 Tel98399 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd3 Loop Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) 10.00-15.00, Southbound C/W Lane 1 And F/W To Chamber (Ped Access Maintained)

Responsibility for works: Transport For London

Current status: Planned work about to start

B490 Winchester Street, Acton

17 August — 19 August

Delays likely Traffic control (multi-way signals)

Works location: B490

Works description: 27/040 Tel98399 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd5 Loop Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) 10.00-15.00, Northbound C/W Lane 1 And F/W To Chamber (Ped Access Maintained)

Responsibility for works: Transport For London

Current status: Planned work about to start

Grove Park Terrace, Chiswick

14 August — 17 August

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Network Rail Infrastructure Ltd

Current status: Planned work about to start

A4 Hogarth Lane, Chiswick

15 August — 16 August

Delays likely Lane closure

Works location: A4

Works description: 25/242 - 107103 - Installation Of Magnetomer Studs Under Scoot Contract For Tfl Sd7.8.9 Short Stay, 2200 - 0500, N/B Lane3& 2 Closed, Swithc To Lane 1 Closed, Mobile Working For Stud Installation Short Stay Only.

Responsibility for works: Transport For London

Current status: Planned work about to start

B491 Turnham Green Terrace, Chiswick

10 August — 23 August

Delays likely Traffic control (two-way signals)

Works location: B491

Works description: Sewer Failure--Works Intended To Include First Time Permanent Reinstatement Within Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

A406 Gunnersbury Avenue (North Circular Road)

11 July — 21 August

Delays likely Lane closure

Works location: A406

Works description: Closure Of One Northbound Lane To Facilitate The Diversion Of Thames Water Main Onto Service Bridge. Northbound Traffic Flow Maintained In Lane Two

Responsibility for works: Transport For London

Current status: Planned work about to start

A307/A205 Kew Road, Kew

01 August — 25 September

Delays likely Road closure

Works location: A307/A205

Works description: Installation Of Temporary Barriers, Refurbishment And Replacement Of Service Bay Cover Slabs

Responsibility for works: Transport For London

Current status: Advanced planning

Source: www.roadworks.org