Lane closures on A316 and works at Grove Park Terrace level crossing
The following roadworks are likely to cause some delays in the Chiswick area:
Delay and disruption is likely on the A316 (Great Chertsey Rd) near Chiswick Bridge due to road and others works: The areas affected are;
Great Chertsey Road (A316)
24 March — 25 April
Delays likely Lane closure
Works location: Footway Adjacent To Junction Of Hartington Road. Fault In Great Chertsey Road (A316)
Works description: Cable Fault Rectification
Responsibility for works: National Grid Company
Current status: Planned work about to start
Grove Park Terrace, Chiswick |
29 March — 31 March |
Delays likely Road closure |
Works location: Grove Park Terrace Level Crossng |
Works description: Works To Be Completed Throughout Lx Area -Re: Railing Grove Park Terrace Level Crossing - On Sat 29/03/2014 From 22:00hrs To Mon 31/03/2014 04:00hrs. |
Responsibility for works: Network Rail Infrastructure Ltd |
Current status: Advanced planning |
|
|
Hartington Road, Chiswick |
29 March — 31 March |
Delays possible Traffic control (two-way signals) |
Works location: Opposite 17 |
Works description: Repair To A Damaged Service Pipe In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
Source: www.roadworks.org
March 24, 2014
|