Traffic Delays Likely in Chiswick

Planned roadworks in the W4 area

 
Participate

Traffic and Travel in Chiswick

Sign up for our weekly Chiswick newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Chiswick area: Some may not cause delays but residents may be interested to know of work going on in advance.

 

A315 Chiswick High Road, Chiswick, London, London Borough Of Hounslow

30 September — 30 September Some carriageway incursion

Delays possible due to Streetworks
Pfi C/W Resurfacing at A315

Responsibility: Hounslow London Borough Council

EToN status: Advanced planning

Power Road, Chiswick, London, London Borough Of Hounslow

30 September — 05 October Traffic control (two-way signals)

Delays possible due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

St Peter'S Road, London, Hammersmith And Fulham

29 September — 05 October Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

A4/A3005 Great West Road, Brentford

07 March — 30 November

Delays likely Lane closure

Works location: A4/A3005

Works description: Strengthening Works At Piers 19,20& 30 And 38-103 On The A4 Great West Rd With Night Time Lane Closures Between Chiswick ( Larch Drive & Boston Manor Rd During The Hours Of 10.30pm To 05.00am Mondays-Sundays Inclusive. Lane Closures Will Be A Lane 1 & 2 Closure With Lane 3 Running Or A Lane 2 & 3 Closure With Lane 1 Running Both East And West Bound On The A4 . See Package 3 Works Location Drawing Attached : Drawing 5103542/Dr/St/Wp3/001 Coordinated With Hammersmith Flyover

Responsibility for works: Highways Agency

Current status: Planned work about to start

Source: www.roadworks.org

September 29, 2015

Bookmark and Share